Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Shrimp, Onionrings, Cheese sticks and french toast
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 130,000
ft2
Annual Production 32,000,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $481,564 10,296,014
kWh
Electricity Demand $39,899 22,824
kW-mo/yr
Electricity Fees $9,141 -
Natural Gas $45,239 17,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $135,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $55,998 $50 $51,948
1,105,217
kWh
$4,050
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $13,385 $26,920 $12,603
268,171
kWh
$782
-
kW-mo/yr
- -
03 2.7261: Install timers and/or thermostats $3,547 $450 $3,547
75,322
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $988 $3,270 $988
21,102
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $2,622 $270 $2,376
50,410
kWh
$246
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,004 $40 $1,816
38,687
kWh
$188
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $1,124 $520 $1,018
21,688
kWh
$106
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,057 $3,503 $957
20,516
kWh
$100
-
kW-mo/yr
- -
09 3.4115: Recover and reuse cooling water $49,625 $65,000 - - - $49,625
-
lb
10 3.4113: Treat and reuse rinse waters $2,220 $975 - - $2,220
-
Tgal
-
11 3.4115: Recover and reuse cooling water $4,772 $100 - - $4,772
-
Tgal
-
TOTAL RECOMMENDED $137,342 $101,098 $75,253
1,601,113
kWh
$5,472
-
kW-mo/yr
$6,992
-
Tgal
$49,625
-
lb
TOTAL IMPLEMENTED $135,230 $97,308 $73,247
1,558,323
kWh
$5,366
-
kW-mo/yr
$6,992
-
Tgal
$49,625
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs