Assessment Year | 1996 |
---|---|
Principal Product | Garage Doors and Door Hardware |
NAICS |
n/a
|
SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
Sales Range | $10 M to 50M |
# of Employees | 101 |
Plant Area |
133,900
ft2
|
Annual Production | 199,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $55,278 | 1,628,664 |
kWh
|
$0.034 |
Electricity Demand | $30,088 | 2,098 |
kW-mo/yr
|
$14.34 |
Electricity Fees | $6,654 | - |
|
- |
Natural Gas | $18,130 | 7,463 |
MMBtu
|
$2.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,534 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,814 | $3,671 |
$821
25,791
kWh
|
$993
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,601 | $6,270 |
$834
26,084
kWh
|
$767
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,408 | $750 |
$1,408
44,256
kWh
|
- | - | - | - | - | - | |
04 | 2.7135: Install occupancy sensors | $1,101 | $825 |
$537
16,999
kWh
|
$564
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $543 | $750 |
$543
16,999
kWh
|
- | - | - | - | - | - | |
06 | 4.431: Train operators for maximum operating efficiency | $26,027 | $7,500 | - | - | - |
$1,327
-
lb
|
- | $24,700 | - | |
07 | 3.5316: Contract a wood pallet recycling company | $9,618 | $370 | - | - | - |
$4,423
-
lb
|
$5,195 | - | - | |
08 | 3.4158: Use minimum cooling water to bearings | $684 | $425 | - | - |
$318
-
Tgal
|
- | - | - |
$366
-
Tgal
|
|
TOTAL RECOMMENDED | $42,796 | $20,561 |
$4,143
130,129
kWh
|
$2,324
-
kW-mo/yr
|
$318
-
Tgal
|
$5,750
-
lb
|
$5,195 | $24,700 |
$366
-
Tgal
|
||
TOTAL IMPLEMENTED | $31,534 | $18,616 |
$3,063
96,131
kWh
|
$1,760
-
kW-mo/yr
|
$318
-
Tgal
|
$1,327
-
lb
|
- | $24,700 |
$366
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |