ITAC Assessment: AM0037
ITAC logo
ITAC Assessment: AM0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CARBIDE INSERTS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area
n/a
Annual Production 1,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,769 1,364,889
kWh
Natural Gas $379 95
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $7,390 $12,000 $7,390
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,550 $1,000 $2,550
59,203
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,881 $373 $1,881
35,756
kWh
04 2.6232: Install set-back timers $1,280 - $1,280
26,964
kWh
05 2.2511: Insulate bare equipment $860 $740 $860
19,930
kWh
06 2.4312: Improve lubrication practices $370 - $370
8,499
kWh
07 2.6127: Maintain air filters by cleaning or replacement $68 $150 $68
1,465
kWh
08 2.6212: Turn off equipment during breaks, reduce operating time $120 $100 $120
2,638
kWh
TOTAL RECOMMENDED $14,519 $14,363 $14,519
154,455
kWh
TOTAL IMPLEMENTED $14,451 $14,213 $14,451
152,990
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs