Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,089

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0550 #01 Y:1995 Recover waste heat from equipment $2,325 $4,100
MA0336 #05 Y:1995 Turn off equipment during breaks, reduce operating time $461 -
MA0336 #04 Y:1995 Interlock heating and air conditioning systems to prevent simultaneous operation $582 -
MA0336 #03 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $595 $580
MA0336 #02 Y:1995 Install occupancy sensors $854 $2,191
MA0336 #01 Y:1995 Use waste heat from flue gases to heat space conditioning air $1,427 -
NC0055 #08 Y:1995 Minimize water usage $331,638 $1,750,000
NC0055 #07 Y:1995 Minimize water usage $8,114 $10,000
NC0055 #06 Y:1995 Utilize outside air instead of conditioned air for drying $56,724 $55,000
NC0055 #05 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $8,143 $28,000
NC0055 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $658 $3,360
NC0055 #03 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,431 $480
NC0055 #02 Y:1995 Make ice during off peak hours for cooling $144,508 $638,000
NC0055 #01 Y:1995 Analyze flue gas for proper air/fuel ratio $1,521 $1,200
MA0337 #06 Y:1995 Reduce the pressure of compressed air to the minimum required $484 -
MA0337 #05 Y:1995 Utilize energy-efficient belts and other improved mechanisms $750 $1,200
MA0337 #04 Y:1995 Install compressor air intakes in coolest locations $850 $800
MA0337 #03 Y:1995 Eliminate third shift $4,455 -
MA0337 #02 Y:1995 Replace city water with recycled water via cooling tower $4,708 $5,000
MA0337 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $16,934 $44,000