6,089
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0550 #01 Y:1995 | 01 | 1995 | Recover waste heat from equipment | $2,325 | $4,100 | n/a |
| MA0336 #05 Y:1995 | 05 | 1995 | Turn off equipment during breaks, reduce operating time | $461 | - | |
| MA0336 #04 Y:1995 | 04 | 1995 | Interlock heating and air conditioning systems to prevent simultaneous operation | $582 | - | |
| MA0336 #03 Y:1995 | 03 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $595 | $580 | |
| MA0336 #02 Y:1995 | 02 | 1995 | Install occupancy sensors | $854 | $2,191 | |
| MA0336 #01 Y:1995 | 01 | 1995 | Use waste heat from flue gases to heat space conditioning air | $1,427 | - | |
| NC0055 #08 Y:1995 | 08 | 1995 | Minimize water usage | $331,638 | $1,750,000 | |
| NC0055 #07 Y:1995 | 07 | 1995 | Minimize water usage | $8,114 | $10,000 | |
| NC0055 #06 Y:1995 | 06 | 1995 | Utilize outside air instead of conditioned air for drying | $56,724 | $55,000 | |
| NC0055 #05 Y:1995 | 05 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $8,143 | $28,000 | |
| NC0055 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $658 | $3,360 | |
| NC0055 #03 Y:1995 | 03 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,431 | $480 | |
| NC0055 #02 Y:1995 | 02 | 1995 | Make ice during off peak hours for cooling | $144,508 | $638,000 | |
| NC0055 #01 Y:1995 | 01 | 1995 | Analyze flue gas for proper air/fuel ratio | $1,521 | $1,200 | |
| MA0337 #06 Y:1995 | 06 | 1995 | Reduce the pressure of compressed air to the minimum required | $484 | - | |
| MA0337 #05 Y:1995 | 05 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $750 | $1,200 | |
| MA0337 #04 Y:1995 | 04 | 1995 | Install compressor air intakes in coolest locations | $850 | $800 | |
| MA0337 #03 Y:1995 | 03 | 1995 | Eliminate third shift | $4,455 | - | |
| MA0337 #02 Y:1995 | 02 | 1995 | Replace city water with recycled water via cooling tower | $4,708 | $5,000 | |
| MA0337 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $16,934 | $44,000 |