ITAC Assessment: MA0336
ITAC logo
ITAC Assessment: MA0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Basement Doors
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 115,000
ft2
Annual Production 43,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,090 905,920
kWh
Fuel Oil #2 $25,446 5,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $1,427 - - $1,427
-
MMBtu
02 2.7135: Install occupancy sensors $854 $2,191 $854
9,672
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $595 $580 $595
6,741
kWh
-
04 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $582 - $582
4,982
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $461 - $461
5,275
kWh
-
TOTAL RECOMMENDED $3,919 $2,771 $2,492
26,670
kWh
$1,427
-
MMBtu
TOTAL IMPLEMENTED $3,065 $580 $1,638
16,998
kWh
$1,427
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs