ITAC Assessment: LT8395
ITAC logo
ITAC Assessment: LT8395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Job Orders (metal components)
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 343,585
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 7,611
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,082 668,800
kWh
Electricity Demand $24,604 2,149
kW-mo/yr
Natural Gas $3,249 208
MMBtu
Fuel Oil #1 $41,409 1,662
MMBtu
Waste Disposal Costs
Water Usage $1,383 176
Tgal
Water Disposal $1,383 176
Tgal
TOTAL YEARLY COSTS $120,109
RECOMMENDED SAVINGS* $9,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings
01 4.652: Replace existing equipment with more suitable substitutes $4,436 $30,000 - - $4,436
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,463 $2,499 $1,838
25,493
kWh
$625
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,671 $285 $2,671
38,041
kWh
- -
TOTAL RECOMMENDED $9,570 $32,784 $4,509
63,533
kWh
$625
-
kW-mo/yr
$4,436
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs