Assessment Year | 2024 |
---|---|
Principal Product | Job Orders (metal components) |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
343,585
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 7,611
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $48,082 | 668,800 |
kWh
|
$0.072 | |
Electricity Demand | $24,604 | 2,149 |
kW-mo/yr
|
$11.45 | |
Natural Gas | $3,249 | 208 |
MMBtu
|
$15.64 | |
Fuel Oil #1 | $41,409 | 1,662 |
MMBtu
|
$24.91 | |
Waste Disposal Costs | |||||
Water Usage | $1,383 | 176 |
Tgal
|
$7.86 | |
Water Disposal | $1,383 | 176 |
Tgal
|
$7.86 | |
TOTAL YEARLY COSTS | $120,109 | ||||
RECOMMENDED SAVINGS* | $9,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings |
---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $4,436 | $30,000 | - | - |
$4,436
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,463 | $2,499 |
$1,838
25,493
kWh
|
$625
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,671 | $285 |
$2,671
38,041
kWh
|
- | - | |
TOTAL RECOMMENDED | $9,570 | $32,784 |
$4,509
63,533
kWh
|
$625
-
kW-mo/yr
|
$4,436
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs