| Assessment Year | 1995 |
|---|---|
| Principal Product | Recycled Polyethylene Plastic Flakes |
| NAICS |
n/a
|
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | less than $500 k |
| # of Employees | 45 |
| Plant Area |
60,000
ft2
|
| Annual Production | 16,000,000
lb
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,610 | 876,612 |
kWh
|
$0.068 |
| Natural Gas | $16,818 | 2,802 |
MMBtu
|
$6.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $2,325 | $4,100 | n/a |
$2,325
34,291
kWh
|
- |
| 02 | 2.2136: Install / repair insulation on steam lines | $342 | $230 | n/a | - |
$342
-
MMBtu
|
| 03 | 2.2135: Repair and eliminate steam leaks | $70 | $45 | n/a | - |
$70
-
MMBtu
|
| 04 | 2.1224: Replace boiler | $3,542 | $7,100 | n/a | - |
$3,542
-
MMBtu
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,288 | $6,243 | n/a |
$3,288
48,359
kWh
|
- |
| TOTAL RECOMMENDED | $9,567 | $17,718 |
$5,613
82,650
kWh
|
$3,954
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs