ITAC Assessment: GT0550
ITAC logo
ITAC Assessment: GT0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Recycled Polyethylene Plastic Flakes
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range less than $500
k
# of Employees 45
Plant Area 60,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 5,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,610 876,612
kWh
Natural Gas $16,818 2,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $2,325 $4,100 n/a $2,325
34,291
kWh
-
02 2.2136: Install / repair insulation on steam lines $342 $230 n/a - $342
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $70 $45 n/a - $70
-
MMBtu
04 2.1224: Replace boiler $3,542 $7,100 n/a - $3,542
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,288 $6,243 n/a $3,288
48,359
kWh
-
TOTAL RECOMMENDED $9,567 $17,718 $5,613
82,650
kWh
$3,954
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs