Assessment Year | 2023 |
---|---|
Principal Product | Finished aircraft parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
80,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $349,981 | 5,833,046 |
kWh
|
$0.060 | |
Electricity Demand | $294,301 | 13,353 |
kW-mo/yr
|
$22.04 | |
Electricity Fees | $10,876 | - |
|
- | |
Natural Gas | $302,745 | 35,864 |
MMBtu
|
$8.44 | |
Waste Disposal Costs | |||||
Water Usage | $43,198 | 10,315 |
Tgal
|
$4.19 | |
Water Disposal | $43,626 | 10,315 |
Tgal
|
$4.23 | |
TOTAL YEARLY COSTS | $1,044,727 | ||||
RECOMMENDED SAVINGS* | $181,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $116,792 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,046 | $25,523 |
$21,646
360,774
kWh
|
$13,400
-
kW-mo/yr
|
- | |
02 | 2.9114: Use solar heat to make electricty | $45,764 | $511,000 |
$45,764
762,741
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,079 | $1,741 |
$19,079
317,988
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $6,550 | $554 |
$4,368
72,796
kWh
|
$2,182
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $13,655 | - |
$13,655
227,585
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,107 | $15,033 |
$17,107
285,117
kWh
|
- | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $5,622 | $10,410 |
$5,622
93,694
kWh
|
- | - | |
08 | 2.2514: Cover open tanks | $39,010 | $6,977 | - | - |
$39,010
-
MMBtu
|
|
TOTAL RECOMMENDED | $181,833 | $571,238 |
$127,241
2,120,695
kWh
|
$15,582
-
kW-mo/yr
|
$39,010
-
MMBtu
|
||
TOTAL IMPLEMENTED | $116,792 | $49,828 |
$62,200
1,036,675
kWh
|
$15,582
-
kW-mo/yr
|
$39,010
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs