ITAC Assessment: MA0337
ITAC logo
ITAC Assessment: MA0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product motion transfer devices
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 229
Plant Area 110,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,997 2,789,566
kWh
Natural Gas $20,828 2,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,181 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,934 $44,000 $16,934
153,576
kWh
-
02 3.4114: Replace city water with recycled water via cooling tower $4,708 $5,000 $(-220.0)
(-1,172)
kWh
$4,928
-
Tgal
03 2.6225: Eliminate third shift $4,455 - $4,455
67,409
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $850 $800 $850
9,379
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $750 $1,200 $750
5,275
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $484 - $484
7,327
kWh
-
TOTAL RECOMMENDED $28,181 $51,000 $23,253
241,794
kWh
$4,928
-
Tgal
TOTAL IMPLEMENTED $17,684 $45,200 $17,684
158,851
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs