Assessment Year | 2013 |
---|---|
Principal Product | Truck Cab / Painted Cabs / Trucks |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | less than $500 k |
# of Employees | 824 |
Plant Area |
2,351,000
ft2
|
Annual Production | 20,807
pieces
|
Production Hrs. Annual | 1,920
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,897,863 | 59,086,908 |
kWh
|
$0.049 |
Electricity Demand | $251,988 | 128,412 |
kW-mo/yr
|
$1.96 |
Natural Gas | $855,370 | 236,758 |
MMBtu
|
$3.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $324,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,221 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $10,877 | $5,000 | - |
$10,877
-
kW-mo/yr
|
- | - | |
02 | 2.4151: Develop a repair/replace policy | $17,313 | $23,026 |
$3,949
78,983
kWh
|
$414
-
kW-mo/yr
|
- | $12,950 | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $994 | - |
$896
17,924
kWh
|
$98
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $142,557 | $165,900 |
$132,519
2,650,385
kWh
|
$10,038
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $26,335 | $15,900 |
$25,048
500,967
kWh
|
$1,287
-
kW-mo/yr
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $33,247 | $3,000 |
$30,247
604,931
kWh
|
- | - | $3,000 | |
07 | 2.4323: Use optimum size and capacity equipment | $14,025 | $21,037 |
$13,288
265,755
kWh
|
$737
-
kW-mo/yr
|
- | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,506 | - |
$13,506
270,127
kWh
|
- | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $7,452 | $5,725 |
$7,452
153,848
kWh
|
- | - | - | |
10 | 2.2414: Use waste heat from hot flue gases to preheat | $16,273 | $31,000 | - | - |
$16,273
-
MMBtu
|
- | |
11 | 2.1116: Improve combustion control capability | $4,252 | $2,000 | - | - |
$4,252
-
MMBtu
|
- | |
12 | 2.1133: Adjust burners for efficient operation | $2,274 | $5,000 | - | - |
$2,274
-
MMBtu
|
- | |
13 | 2.1233: Analyze flue gas for proper air/fuel ratio | $538 | $1,000 | - | - |
$538
-
MMBtu
|
- | |
14 | 2.4133: Use most efficient type of electric motors | $20,883 | $41,766 |
$19,962
399,245
kWh
|
$921
-
kW-mo/yr
|
- | - | |
15 | 2.7261: Install timers and/or thermostats | $14,454 | $16,450 |
$14,454
289,080
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $324,980 | $336,804 |
$261,321
5,231,245
kWh
|
$24,372
-
kW-mo/yr
|
$23,337
-
MMBtu
|
$15,950 | ||
TOTAL IMPLEMENTED | $67,221 | $34,026 |
$35,092
701,838
kWh
|
$11,389
-
kW-mo/yr
|
$4,790
-
MMBtu
|
$15,950 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs