Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,848

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0686 #06 Y:2000 Insulate bare equipment $4,025 $9,895
GT0686 #05 Y:2000 Insulate bare equipment $1,280 $1,105
GT0686 #04 Y:2000 Insulate bare equipment $1,400 $500
GT0686 #03 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $5,607 $700
GT0686 #02 Y:2000 Turn off equipment when not in use $1,980 -
GT0686 #01 Y:2000 Change rate schedules or other changes in utility service $74,340 -
UM0161 #05 Y:2000 Upgrade obsolete equipment $5,016 $5,700
UM0161 #04 Y:2000 Install vinyl strip / high speed / air curtain doors $1,098 $656
UM0161 #03 Y:2000 Change rate schedules or other changes in utility service $48,437 $500
UM0161 #02 Y:2000 Install compressor air intakes in coolest locations $2,614 $500
UM0161 #01 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $1,365 $450
UD0594 #03 Y:2000 Use photocell controls $342 -
UD0594 #02 Y:2000 Install equipment to move product $145,552 $100,000
UD0594 #01 Y:2000 Convert from batch operation to continuous processing $189,338 $180,000
TP0016 #11 Y:2000 Utilize energy-efficient belts and other improved mechanisms $334 -
TP0016 #10 Y:2000 Make a practice of turning off lights when not needed $373 -
TP0016 #09 Y:2000 Use most efficient type of electric motors $613 $6,187
TP0016 #08 Y:2000 Use synthetic lubricant $595 -
TP0016 #07 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $1,423 $280
TP0016 #06 Y:2000 Install occupancy sensors $1,456 -