ITAC Assessment: UM0161
ITAC logo
ITAC Assessment: UM0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Tubular Assemblies
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 70,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,839 2,269,930
kWh
Electricity Fees $(-4,767.0) -
Natural Gas $41,449 10,241
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,365 $450 $1,365
14,068
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $2,614 $500 $2,614
26,964
kWh
- -
03 2.8114: Change rate schedules or other changes in utility service $48,437 $500 - $48,437 -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,098 $656 - - $1,098
-
MMBtu
05 2.4321: Upgrade obsolete equipment $5,016 $5,700 $5,016
52,462
kWh
- -
TOTAL RECOMMENDED $58,530 $7,806 $8,995
93,494
kWh
$48,437 $1,098
-
MMBtu
TOTAL IMPLEMENTED $49,802 $950 $1,365
14,068
kWh
$48,437 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs