ITAC Assessment: ST0049
ITAC logo
ITAC Assessment: ST0049
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CUSTOMIZED STEEL DRUMS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 1,300,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,642 2,478,019
kWh
Natural Gas $259,056 36,076
MMBtu
Fuel Oil #2 $1,661 280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,975 $500 $16,975
213,951
kWh
- - -
02 2.4312: Improve lubrication practices $4,051 - $4,231
53,341
kWh
- - $(-180.0)
03 2.4133: Use most efficient type of electric motors $5,293 $10,360 $5,293
66,823
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $651 $1,550 $651
8,206
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,832 $480 $1,832
23,154
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $651 $250 $651
8,206
kWh
- - -
07 2.2437: Recover waste heat from equipment $3,964 $1,600 - $3,964
-
MMBtu
- -
08 2.7447: Install vinyl strip / high speed / air curtain doors $4,632 $545 - $4,632
-
MMBtu
- -
09 2.7229: Air condition only space necessary $453 $800 - $453
-
MMBtu
- -
10 2.7224: Reduce space conditioning during non-working hours $15,049 - - $14,115
-
MMBtu
$934
-
MMBtu
-
11 2.1123: Install automatic stack damper $961 $4,950 - $961
-
MMBtu
- -
12 3.4115: Recover and reuse cooling water $5,781 - $59
879
kWh
- - $5,722
TOTAL RECOMMENDED $60,293 $21,035 $29,692
374,560
kWh
$24,125
-
MMBtu
$934
-
MMBtu
$5,542
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs