Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,667

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0430 #06 Y:1994 Combine utility meters $89,640 $40,000
UD0430 #05 Y:1994 Recover heat from exhausted steam, hot air or hot water $2,919 $5,000
UD0430 #04 Y:1994 Use hot process fluids to preheat incoming process fluids $268 $500
UD0430 #03 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,410 $2,106
UD0430 #02 Y:1994 Recover waste heat from equipment $2,425 $5,000
UD0430 #01 Y:1994 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,693 $10,000
MA0303 #03 Y:1994 Utilize energy-efficient belts and other improved mechanisms $616 -
MA0303 #02 Y:1994 Install occupancy sensors $640 $367
MA0303 #01 Y:1994 Install compressor air intakes in coolest locations $2,413 $644
HO0078 #05 Y:1994 Install / repair insulation on steam lines $253 $113
HO0078 #04 Y:1994 Install compressor air intakes in coolest locations $1,509 $800
HO0078 #03 Y:1994 Use most efficient type of electric motors $3,930 $5,390
HO0078 #02 Y:1994 Utilize higher efficiency lamps and/or ballasts $2,524 $3,277
HO0078 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $5,943 $5,010
NV0003 #04 Y:1994 Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,818 $2,000
NV0003 #03 Y:1994 Install compressor air intakes in coolest locations $1,340 $230
NV0003 #02 Y:1994 Install occupancy sensors $920 $180
NV0003 #01 Y:1994 Use most efficient type of electric motors $2,929 $129
MO0119 #09 Y:1994 Reduce hot water temperature to the minimum required $18 $25
MO0119 #08 Y:1994 Analyze flue gas for proper air/fuel ratio $355 $300