ITAC Assessment: NV0003
ITAC logo
ITAC Assessment: NV0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Salad Dressing
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 154,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,581 3,548,066
kWh
Natural Gas $105,727 23,305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,929 $129 $2,929
48,359
kWh
-
02 2.7135: Install occupancy sensors $920 $180 $920
13,189
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,340 $230 $1,340
22,274
kWh
-
04 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,818 $2,000 - $3,818
-
MMBtu
TOTAL RECOMMENDED $9,007 $2,539 $5,189
83,822
kWh
$3,818
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs