ITAC Assessment: MO0119
ITAC logo
ITAC Assessment: MO0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product flexible printed plastic film
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 27,000
ft2
Annual Production 400,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,092 2,417,351
kWh
Natural Gas $35,894 7,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $15,785 $300 - - $15,785
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,736 $12,820 $6,736
90,856
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,509 $710 $4,509
60,961
kWh
- -
04 2.4133: Use most efficient type of electric motors $6,257 $9,222 $6,257
84,408
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,947 $335 $1,947
26,377
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $2,151 $584 $2,151
29,015
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,305 $25 $1,305
17,585
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $355 $300 - $355
-
MMBtu
-
09 2.6121: Reduce hot water temperature to the minimum required $18 $25 - $18
-
MMBtu
-
TOTAL RECOMMENDED $39,063 $24,321 $22,905
309,202
kWh
$373
-
MMBtu
$15,785
TOTAL IMPLEMENTED $13,769 $14,439 $13,396
180,832
kWh
$373
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs