Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,175

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0159 #01 Y:2003 Reduce illumination to minimum necessary levels $18,357 $1,000
SF0261 #06 Y:2003 Regrind, reuse, or sell scrap plastic parts $63,661 $36,750
SF0261 #05 Y:2003 Burn wood by-products for heat $25,467 $4,500
SF0261 #04 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $26,010 $33,679
SF0261 #03 Y:2003 Install occupancy sensors $4,341 $485
SF0261 #02 Y:2003 Upgrade controls on compressors $3,924 $52
SF0261 #01 Y:2003 Repair and eliminate steam leaks $10,012 -
SD0325 #08 Y:2003 Eliminate or reduce compressed air usage $8,279 $1,410
SD0325 #07 Y:2003 Install skylights $9,297 $18,000
SD0325 #06 Y:2003 Chill water to the highest temperature possible $14,542 -
SD0325 #05 Y:2003 Install timers and/or thermostats $36,071 $1,000
SD0325 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $37,849 $2,000
SD0325 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $53,956 $32,725
SD0325 #02 Y:2003 Turn off equipment when not in use $71,754 -
SD0325 #01 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $88,041 $300,075
NC0257 #09 Y:2003 Use photocell controls $1,346 $1,540
NC0257 #08 Y:2003 Reschedule plant operations or reduce load to avoid peaks $3,407 $840
NC0257 #07 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,455 $500
NC0257 #06 Y:2003 Utilize energy-efficient belts and other improved mechanisms $8,771 $2,118
NC0257 #05 Y:2003 Develop a repair/replace policy $8,216 $8,241