ITAC Assessment: LE0159
ITAC logo
ITAC Assessment: LE0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Small Diameter Tubing
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 377
Plant Area 350,000
ft2
Annual Production 4,736
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,390 10,840,000
kWh
Electricity Demand $270,891 22,518
kW-mo/yr
Natural Gas $171,542 25,193
MMBtu
Fuel Oil #6 $189,025 44,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Personnel Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $18,357 $1,000 $12,812
230,430
kWh
$5,545
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,138 $300 $6,378
114,707
kWh
$2,760
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,945 - $1,144
20,569
kWh
$801
-
kW-mo/yr
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $4,620 - - - $2,448
-
MMBtu
$2,172
-
MMBtu
- -
05 2.2414: Use waste heat from hot flue gases to preheat $23,055 $13,500 - - $9,905
-
MMBtu
$13,150
-
MMBtu
- -
06 3.4115: Recover and reuse cooling water $1,286 $25,500 $(-3,982.0)
(-71,616)
kWh
$(-1,732.0)
-
kW-mo/yr
- - $12,000 $(-5,000.0)
-
Tgal
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $45,153 $100,000 $58,287
1,048,320
kWh
$17,323
-
kW-mo/yr
$(-30,457.0)
-
MMBtu
- - -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,548 $2,500 - $13,548
-
kW-mo/yr
- - - -
09 2.7441: Replace broken windows and/or window sash $8,620 $12,247 - - $8,620
-
MMBtu
- - -
10 2.7447: Install vinyl strip / high speed / air curtain doors $9,932 $37,964 - - $9,932
-
MMBtu
- - -
TOTAL RECOMMENDED $135,654 $193,011 $74,639
1,342,410
kWh
$38,245
-
kW-mo/yr
$448
-
MMBtu
$15,322
-
MMBtu
$12,000 $(-5,000.0)
-
Tgal
TOTAL IMPLEMENTED $13,758 $300 $6,378
114,707
kWh
$2,760
-
kW-mo/yr
$2,448
-
MMBtu
$2,172
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs