ITAC Assessment: OR0457
ITAC logo
ITAC Assessment: OR0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Frozen Vegetables
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 287,300
ft2
Annual Production 254,000,000
thousand feet
Production Hrs. Annual 4,368
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,876 12,810,450
kWh
Electricity Demand $120,941 293,784
kW-mo/yr
Electricity Fees $101,175 -
Natural Gas $117,440 16,806
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,600 $25,000 $20,450
385,000
kWh
$4,150
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,140 $10,000 $5,070
95,300
kWh
$1,070
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $31,300 - $26,300
495,000
kWh
$5,000
-
kW-mo/yr
-
04 2.2622: Replace existing chiller with high efficiency model $13,100 $42,000 $11,600
219,000
kWh
$1,500
-
kW-mo/yr
-
05 2.2621: Modify refrigeration system to operate at a lower pressure $18,900 - $18,900
355,000
kWh
- -
06 2.1231: Establish burner maintenance schedule for boilers $2,520 $300 - - $2,520
-
MMBtu
TOTAL RECOMMENDED $96,560 $77,300 $82,320
1,549,300
kWh
$11,720
-
kW-mo/yr
$2,520
-
MMBtu
TOTAL IMPLEMENTED $77,320 $25,300 $65,650
1,235,000
kWh
$9,150
-
kW-mo/yr
$2,520
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs