Assessment Year | 2004 |
---|---|
Principal Product | Frozen Vegetables |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $100 M to 500M |
# of Employees | 500 |
Plant Area |
287,300
ft2
|
Annual Production | 254,000,000
thousand feet
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $680,876 | 12,810,450 |
kWh
|
$0.053 |
Electricity Demand | $120,941 | 293,784 |
kW-mo/yr
|
$0.41 |
Electricity Fees | $101,175 | - |
|
- |
Natural Gas | $117,440 | 16,806 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $96,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,320 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,600 | $25,000 |
$20,450
385,000
kWh
|
$4,150
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,140 | $10,000 |
$5,070
95,300
kWh
|
$1,070
-
kW-mo/yr
|
- | |
03 | 2.4224: Upgrade controls on compressors | $31,300 | - |
$26,300
495,000
kWh
|
$5,000
-
kW-mo/yr
|
- | |
04 | 2.2622: Replace existing chiller with high efficiency model | $13,100 | $42,000 |
$11,600
219,000
kWh
|
$1,500
-
kW-mo/yr
|
- | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $18,900 | - |
$18,900
355,000
kWh
|
- | - | |
06 | 2.1231: Establish burner maintenance schedule for boilers | $2,520 | $300 | - | - |
$2,520
-
MMBtu
|
|
TOTAL RECOMMENDED | $96,560 | $77,300 |
$82,320
1,549,300
kWh
|
$11,720
-
kW-mo/yr
|
$2,520
-
MMBtu
|
||
TOTAL IMPLEMENTED | $77,320 | $25,300 |
$65,650
1,235,000
kWh
|
$9,150
-
kW-mo/yr
|
$2,520
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs