Assessment Year | 1990 |
---|---|
Principal Product | POLYSTYRENE CONTAINERS |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | $1 M to 5M |
# of Employees | 16 |
Plant Area |
n/a
|
Annual Production | 450,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,204 | 1,983,880 |
kWh
|
$0.074 |
LPG | $3,015 | 211 |
MMBtu
|
$14.29 |
Fuel Oil #2 | $18,574 | 4,228 |
MMBtu
|
$4.39 |
Wood | $175,499 | 78,011 |
MMBtu
|
$2.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,217 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $583 | $381 | - | - |
$583
-
MMBtu
|
|
02 | 2.2121: Increase amount of condensate returned | $9,178 | $2,409 | - | - |
$9,178
-
MMBtu
|
|
03 | 3.6124: Burn waste oil for heat | $2,531 | $559 | - |
$3,015
-
MMBtu
|
$(-484.0)
-
MMBtu
|
|
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,856 | - |
$1,856
-
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,134 | $2,460 |
$1,134
15,240
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $65 | $44 |
$65
879
kWh
|
- | - | |
07 | 2.2211: Use optimum temperature | $4,435 | - |
$4,435
59,789
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,370 | $99 |
$2,370
31,946
kWh
|
- | - | |
09 | 2.6232: Install set-back timers | $65 | $65 |
$65
879
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,217 | $6,017 |
$9,925
108,733
kWh
|
$3,015
-
MMBtu
|
$9,277
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs