ITAC Assessment: NV0072
ITAC logo
ITAC Assessment: NV0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Beer and Ale
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 78,000
ft2
Annual Production 250,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,175 2,981,536
kWh
Electricity Demand $32,238 7,599
kW-mo/yr
Electricity Fees $17,198 -
Natural Gas $167,491 32,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $11,359 $766 $10,362
121,043
kWh
$560
-
kW-mo/yr
$437 - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,715 $200 $1,649
19,343
kWh
- $66 - - -
03 2.7134: Use photocell controls $795 $156 $723
8,499
kWh
$41
-
kW-mo/yr
$31 - - -
04 2.7135: Install occupancy sensors $4,438 $558 $4,012
46,893
kWh
$255
-
kW-mo/yr
$171 - - -
05 2.4221: Install compressor air intakes in coolest locations $349 $240 $336
3,810
kWh
- $13 - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,021 - $982
11,430
kWh
- $39 - - -
07 2.8114: Change rate schedules or other changes in utility service $5,739 - - $(-67,204.0)
-
kW-mo/yr
$72,943 - - -
08 2.2511: Insulate bare equipment $6,756 $890 - - - $6,756
-
MMBtu
- -
09 4.212: Adopt in-house material generation $46,800 $600 - - - - - $46,800
10 3.4154: Eliminate leaks in water lines and valves $146 $23 - - - - $146
-
Tgal
-
TOTAL RECOMMENDED $79,118 $3,433 $18,064
211,018
kWh
$(-66,348.0)
-
kW-mo/yr
$73,700 $6,756
-
MMBtu
$146
-
Tgal
$46,800
TOTAL IMPLEMENTED $25,435 $2,437 $17,005
198,709
kWh
$815
-
kW-mo/yr
$713 $6,756
-
MMBtu
$146
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs