ITAC Assessment: UW0004
ITAC logo
ITAC Assessment: UW0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Gears and gear cutting
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 120,000
ft2
Annual Production 6,600
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,795 2,313,360
kWh
Electricity Demand $5,012 480
kW-mo/yr
Electricity Fees $3,453 -
Natural Gas $57,197 11,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,144

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7444: Close holes and openings in building such as broken windows $13,962 $8,762 - - $13,962
-
MMBtu
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,182 $25,800 $6,865
147,001
kWh
$317
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $3,351 $5,595 $2,505
53,616
kWh
$846
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,362 $968 $1,362
29,165
kWh
- -
TOTAL RECOMMENDED $25,857 $41,125 $10,732
229,782
kWh
$1,163
-
kW-mo/yr
$13,962
-
MMBtu
TOTAL IMPLEMENTED $21,144 $34,562 $6,865
147,001
kWh
$317
-
kW-mo/yr
$13,962
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs