Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,546

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0237 #06 Y:2019 Install / repair insulation on condensate lines $817 $1,111
IC0237 #05 Y:2019 Install occupancy sensors $1,275 $177
IC0237 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $10,251 $2,864
IC0237 #03 Y:2019 Recharge batteries on during off-peak demand periods $1,125 -
IC0237 #02 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $32,993 $2,764
IC0237 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $5,797 $2,350
TR0024 #05 Y:2019 Cover containers to minimize evaporative losses $4,527 $10,313
TR0024 #04 Y:2019 Install occupancy sensors $154 $100
TR0024 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $400 $767
TR0024 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $889 $1,131
TR0024 #01 Y:2019 Maintain machines to reduce leaks $402 $576
CL2006 #05 Y:2019 Reduce space conditioning during non-working hours $4,314 $3,400
CL2006 #04 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $5,769 $12,768
CL2006 #03 Y:2019 Modify startup/shutdown times $7,541 $1,000
CL2006 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $13,133 $4,500
CL2006 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $41,598 $51,573
TT0237 #11 Y:2019 Develop a repair/replace policy $339 $653
TT0237 #10 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $520 $760
TT0237 #09 Y:2019 Reduce the pressure of compressed air to the minimum required $4,896 $10
TT0237 #08 Y:2019 Turn off equipment during breaks, reduce operating time $5,445 -