ITAC Assessment: TT0237
ITAC logo
ITAC Assessment: TT0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product HVAC automotive parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 550
Plant Area 224,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,788
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $821,512 8,013,700
kWh
Electricity Demand $44,991 21,936
kW-mo/yr
Natural Gas $8,826 1,061
MMBtu
Waste Disposal Costs
Water Usage $9,885 2,514
Tgal
Water Disposal $8,980 2,514
Tgal
TOTAL YEARLY COSTS $894,194
RECOMMENDED SAVINGS* $96,198 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,248 $3,360 $18,446
179,959
kWh
$2,802
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,481 $13,500 $12,672
123,089
kWh
$809
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $12,785 $4,720 $11,456
111,776
kWh
$1,329
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,403 $33,173 $8,803
85,884
kWh
$414
-
kW-mo/yr
- $3,186
05 2.7261: Install timers and/or thermostats $11,220 $20 $11,220
109,463
kWh
- - -
06 2.4237: Substitute compressed air cooling with water or air cooling $6,985 $480 $6,985
68,148
kWh
- - -
07 3.4155: Meter waste water $6,876 $2,000 - - $6,876
-
Tgal
-
08 2.6212: Turn off equipment during breaks, reduce operating time $5,445 - $5,445
53,124
kWh
- - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $4,896 $10 $4,896
47,775
kWh
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $520 $760 $520
5,073
kWh
- - -
11 2.4151: Develop a repair/replace policy $339 $653 $317
3,091
kWh
$22
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,198 $58,676 $80,759
787,382
kWh
$5,376
-
kW-mo/yr
$6,876
-
Tgal
$3,186
TOTAL IMPLEMENTED $62,608 $39,323 $49,330
481,278
kWh
$3,216
-
kW-mo/yr
$6,876
-
Tgal
$3,186
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs