ITAC Assessment: TR0024
ITAC logo
ITAC Assessment: TR0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 81,983
ft2
Annual Production 2,007,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,021 1,912,320
kWh
Electricity Demand $38,340 3,396
kW-mo/yr
Electricity Fees $1,692 -
TOTAL YEARLY COSTS $108,053
RECOMMENDED SAVINGS* $6,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Consumption Savings
01 3.7311: Maintain machines to reduce leaks $402 $576 - - $402
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $889 $1,131 $754
21,188
kWh
$135
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $400 $767 $256
7,187
kWh
$145
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $154 $100 $154
4,317
kWh
- -
05 3.8121: Cover containers to minimize evaporative losses $4,527 $10,313 - - $4,527
-
Tgal
TOTAL RECOMMENDED $6,373 $12,886 $1,164
32,692
kWh
$280
-
kW-mo/yr
$4,929
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs