Assessment Year | 2020 |
---|---|
Principal Product | Confectionery and Sweet Food Ingredients Manufacturing |
NAICS | 311340: Nonchocolate Confectionery Manufacturing |
SIC | 2064: Candy and Other Confectionery Products |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
158,821
ft2
|
Annual Production | 36,219,850
lb
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $245,273 | 3,892,801 |
kWh
|
$0.063 | |
Electricity Demand | $72,970 | 10,095 |
kW-mo/yr
|
$7.23 | |
Electricity Fees | $37,930 | - |
|
- | |
Natural Gas | $75,117 | 16,010 |
MMBtu
|
$4.69 | |
Waste Disposal Costs | |||||
Water Usage | $76,654 | 1,918 |
Tgal
|
$39.97 | |
TOTAL YEARLY COSTS | $507,945 | ||||
RECOMMENDED SAVINGS* | $52,885 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,797 | $2,350 |
$4,451
74,182
kWh
|
$1,346
-
kW-mo/yr
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $32,993 | $2,764 |
$33,696
561,600
kWh
|
$8,078
-
kW-mo/yr
|
$(-8,781.6)
-
MMBtu
|
|
03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,125 | - | - |
$1,125
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,251 | $2,864 |
$8,456
140,929
kWh
|
$1,795
-
kW-mo/yr
|
- | |
05 | 2.7135: Install occupancy sensors | $1,275 | $177 |
$1,275
21,253
kWh
|
- | - | |
06 | 2.2122: Install / repair insulation on condensate lines | $817 | $1,111 | - | - |
$817
-
MMBtu
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $628 | $200 |
$628
10,470
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,885 | $9,466 |
$48,506
808,434
kWh
|
$12,345
-
kW-mo/yr
|
$(-7,964.9)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs