Assessment Year | 2002 |
---|---|
Principal Product | Finished metal products |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
58,500
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,974 | 1,327,589 |
kWh
|
$0.017 |
Electricity Demand | $73,284 | 5,447 |
kW-mo/yr
|
$13.45 |
Electricity Fees | $193 | - |
|
- |
Natural Gas | $80,590 | 12,347 |
MMBtu
|
$6.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $29,000 | $7,000 | - |
$29,000
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $8,990 | $300 | - | - | - | - | $8,990 | - | |
03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $2,640 | $5,750 |
$520
31,100
kWh
|
$2,120
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $1,110 | $4,890 | - | - |
$1,110
-
MMBtu
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $730 | $300 | - | - |
$730
-
MMBtu
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $290 | $50 |
$60
3,900
kWh
|
$230
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $80 | - |
$200
11,900
kWh
|
$710
-
kW-mo/yr
|
- | $(-310.0) | - | $(-520.0) | |
TOTAL RECOMMENDED | $42,840 | $18,290 |
$780
46,900
kWh
|
$32,060
-
kW-mo/yr
|
$1,840
-
MMBtu
|
$(-310.0) | $8,990 | $(-520.0) | ||
TOTAL IMPLEMENTED | $39,010 | $7,650 |
$60
3,900
kWh
|
$29,230
-
kW-mo/yr
|
$730
-
MMBtu
|
- | $8,990 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs