Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0236 #03 Y:1991 Reschedule plant operations or reduce load to avoid peaks $1,860 $1,600
CO0236 #02 Y:1991 Utilize higher efficiency lamps and/or ballasts $530 $225
CO0236 #01 Y:1991 Reduce space conditioning during non-working hours $820 $100
CO0233 #07 Y:1991 Utilize energy-efficient belts and other improved mechanisms $1,440 $5,580
CO0233 #06 Y:1991 Use most efficient type of electric motors $2,830 $8,890
CO0233 #05 Y:1991 Insulate bare equipment $1,490 $1,870
CO0233 #04 Y:1991 Optimize plant power factor $4,750 $6,480
CO0233 #03 Y:1991 Reduce space conditioning during non-working hours $220 $275
CO0233 #02 Y:1991 Use minimum safe oven ventilation $380 $250
CO0233 #01 Y:1991 Apply for tax-free status for energy purchases $1,100 $250
OR0141 #09 Y:1991 Use most efficient type of electric motors $135 $704
OR0141 #08 Y:1991 Utilize energy-efficient belts and other improved mechanisms $1,134 $5,250
OR0141 #07 Y:1991 Use waste heat from hot flue gases to generate steam $54,852 $200,000
OR0141 #06 Y:1991 Optimize plant power factor $1,819 $4,125
OR0141 #05 Y:1991 Utilize higher efficiency lamps and/or ballasts $2,600 -
OR0141 #04 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $2,158 $3,000
OR0141 #03 Y:1991 Reduce illumination to minimum necessary levels $303 -
OR0141 #02 Y:1991 Utilize higher efficiency lamps and/or ballasts $203 -
OR0141 #01 Y:1991 Analyze flue gas for proper air/fuel ratio $40,488 $1,000
CO0232 #11 Y:1991 Use most efficient type of electric motors $270 $670