ITAC Assessment: CO0236
ITAC logo
ITAC Assessment: CO0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Liquid CO2
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 13,400
ft2
Annual Production 60,000
ton
Production Hrs. Annual 5,144
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,749 4,383,646
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $820 $100 $820
15,826
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $530 $225 $530
10,551
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,860 $1,600 $1,860
-
kWh
04 2.7224: Reduce space conditioning during non-working hours $1,650 $2,000 $1,650
64,185
kWh
05 2.7243: Improve air circulation with destratification fans / other methods $1,900 $1,600 $1,900
36,928
kWh
06 2.4133: Use most efficient type of electric motors $730 $1,200 $730
14,361
kWh
07 2.2136: Install / repair insulation on steam lines $550 $1,290 $550
10,844
kWh
TOTAL RECOMMENDED $8,040 $8,015 $8,040
152,695
kWh
TOTAL IMPLEMENTED $8,040 $8,015 $8,040
152,695
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs