Assessment Year | 1992 |
---|---|
Principal Product | FACTORY LUMBER |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
n/a
|
Annual Production | 16,800
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $112,367 | 2,337,339 |
kWh
|
$0.048 |
Wood | $259,896 | 163,363 |
MMBtu
|
$1.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $40,488 | $1,000 | - |
$40,488
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $203 | - |
$228
6,155
kWh
|
- | $(-25.0) | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $303 | - |
$247
6,155
kWh
|
- | $56 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,158 | $3,000 |
$2,158
46,307
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,600 | - |
$2,065
55,979
kWh
|
- | $535 | |
06 | 2.3212: Optimize plant power factor | $1,819 | $4,125 |
$1,819
-
kWh
|
- | - | |
07 | 2.2422: Use waste heat from hot flue gases to generate steam | $54,852 | $200,000 | - |
$54,852
-
MMBtu
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,134 | $5,250 |
$1,134
26,377
kWh
|
- | - | |
09 | 2.4133: Use most efficient type of electric motors | $135 | $704 |
$135
2,052
kWh
|
- | - | |
TOTAL RECOMMENDED | $103,692 | $214,079 |
$7,786
143,025
kWh
|
$95,340
-
MMBtu
|
$566 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs