ITAC Assessment: CO0233
ITAC logo
ITAC Assessment: CO0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Asphalt and Concrete
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 2,000
ft2
Annual Production 71,000
ton
Production Hrs. Annual 3,337
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,403 312,134
kWh
Natural Gas $60,496 24,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,210 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $1,100 $250 - - $1,100
02 2.2212: Use minimum safe oven ventilation $380 $250 - $380
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $220 $275 - $220
-
MMBtu
-
04 2.3212: Optimize plant power factor $4,750 $6,480 - - $4,750
05 2.2511: Insulate bare equipment $1,490 $1,870 - $1,490
-
MMBtu
-
06 2.4133: Use most efficient type of electric motors $2,830 $8,890 $2,830
18,757
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,440 $5,580 $1,440
8,792
kWh
- -
TOTAL RECOMMENDED $12,210 $23,595 $4,270
27,549
kWh
$2,090
-
MMBtu
$5,850
TOTAL IMPLEMENTED $12,210 $23,595 $4,270
27,549
kWh
$2,090
-
MMBtu
$5,850
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs