ITAC Assessment: AS0588
ITAC logo
ITAC Assessment: AS0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Food Services
NAICS 624210: Community Food Services
SIC 8322: Individual and Family Social Services
Sales Range $1
M
to 5
M
# of Employees 19
Plant Area 56,400
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 1,300
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,718 184,548
kWh
Electricity Demand $9,344 794
kW-mo/yr
Electricity Fees $5,914 -
Natural Gas $3,583 512
MMBtu
LPG $4,302 14
MMBtu
Fuel Oil #1 $20,236 796
MMBtu
Waste Disposal Costs
Water Usage $3,395 411
Tgal
TOTAL YEARLY COSTS $68,492
RECOMMENDED SAVINGS* $30,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $14,762 $37,017 $6,200
52,680
kWh
$282
-
kW-mo/yr
- - - $8,280
02 2.8114: Change rate schedules or other changes in utility service $6,031 $44 - - $6,031 - - -
03 2.1321: Replace fossil fuel equipment with electrical equipment $4,538 $35,163 $(-245.0)
2,080
kWh
$(-19.0)
-
kW-mo/yr
- - - $4,802
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,007 $2,414 $1,079
9,178
kWh
$597
-
kW-mo/yr
- - $331 -
05 2.8223: Add air shields to trucks to increase fuel mileage $1,167 $1,881 - - - $1,167
-
MMBtu
- -
06 2.7132: Install timers on light switches in little used areas $991 $520 $991
8,441
kWh
- - - - -
07 2.7135: Install occupancy sensors $918 $3,416 $753
6,398
kWh
$165
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $30,414 $80,455 $8,778
78,777
kWh
$1,025
-
kW-mo/yr
$6,031 $1,167
-
MMBtu
$331 $13,082
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs