5,175
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0432 #05 Y:2003 | 05 | 2003 | Optimize plant power factor | $8,813 | $8,813 | |
| OR0432 #04 Y:2003 | 04 | 2003 | Reduce the pressure of compressed air to the minimum required | $10,230 | $7,640 | |
| OR0432 #03 Y:2003 | 03 | 2003 | Analyze flue gas for proper air/fuel ratio | $10,830 | $1,200 | |
| OR0432 #02 Y:2003 | 02 | 2003 | Use most efficient type of electric motors | $25,900 | $32,000 | |
| OR0432 #01 Y:2003 | 01 | 2003 | Recycle spent tanning solution | $136,000 | $280,000 | |
| WI0446 #07 Y:2003 | 07 | 2003 | Install adequate dryers on air lines to eliminate blowdown | $452 | $400 | |
| WI0446 #06 Y:2003 | 06 | 2003 | Install compressor air intakes in coolest locations | $945 | $740 | |
| WI0446 #05 Y:2003 | 05 | 2003 | Upgrade controls on compressors | $1,214 | $3,500 | |
| WI0446 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $2,093 | $1,359 | |
| WI0446 #03 Y:2003 | 03 | 2003 | Analyze flue gas for proper air/fuel ratio | $2,528 | $500 | |
| WI0446 #02 Y:2003 | 02 | 2003 | Utilize higher efficiency lamps and/or ballasts | $6,813 | $15,675 | n/a |
| WI0446 #01 Y:2003 | 01 | 2003 | Size electric motors for peak operating efficiency | $20,491 | $40,000 | |
| LE0161 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $6,814 | - | |
| LE0161 #04 Y:2003 | 04 | 2003 | Insulate bare equipment | $17,796 | $6,000 | |
| LE0161 #03 Y:2003 | 03 | 2003 | Install compressor air intakes in coolest locations | $1,357 | $700 | |
| LE0161 #02 Y:2003 | 02 | 2003 | Install vinyl strip / high speed / air curtain doors | $11,365 | $3,000 | |
| LE0161 #01 Y:2003 | 01 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $585 | - | |
| AS0356 #12 Y:2003 | 12 | 2003 | Clear and rent existing space | $96,000 | $8,340 | |
| AS0356 #11 Y:2003 | 11 | 2003 | Lease / purchase baler; sell cardboard to recycler | $4,280 | $17,100 | |
| AS0356 #10 Y:2003 | 10 | 2003 | Air condition only space necessary | $957 | $4,260 |