| Assessment Year | 2003 |
|---|---|
| Principal Product | Glass Design Products |
| NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $1 M to 5M |
| # of Employees | 46 |
| Plant Area |
53,500
ft2
|
| Annual Production | 300
thousand feet
|
| Production Hrs. Annual | 5,616
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $10,883 | 377,457 |
kWh
|
$0.029 |
| Electricity Demand | $5,410 | 615 |
kW-mo/yr
|
$8.80 |
| Natural Gas | $205 | 23 |
MMBtu
|
$8.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,917 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $35,975 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $585 | - |
$351
3,744
kWh
|
$234
-
kW-mo/yr
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,365 | $3,000 | - | - |
$11,365
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,357 | $700 |
$798
8,503
kWh
|
$559
-
kW-mo/yr
|
- | |
| 04 | 2.2511: Insulate bare equipment | $17,796 | $6,000 | - | - |
$17,796
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,814 | - |
$4,828
51,417
kWh
|
$1,986
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $37,917 | $9,700 |
$5,977
63,664
kWh
|
$2,779
-
kW-mo/yr
|
$29,161
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $35,975 | $9,000 |
$4,828
51,417
kWh
|
$1,986
-
kW-mo/yr
|
$29,161
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs