ITAC Assessment: AS0356
ITAC logo
ITAC Assessment: AS0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 52,000
ft2
Annual Production 31,000
thousand feet
Production Hrs. Annual 4,572
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,415 1,125,600
kWh
Electricity Demand $27,206 3,401
kW-mo/yr
Electricity Fees $5,138 -
Natural Gas $5,180 699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $119,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,155 $30,070 $6,601
93,825
kWh
$1,602
-
kW-mo/yr
- - $952
02 2.7111: Reduce illumination to minimum necessary levels $939 $68 $700
9,957
kWh
$239
-
kW-mo/yr
- - -
03 2.7145: Install skylights $4,122 $10,296 n/a $4,122
58,587
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,479 $100 $6,456
91,768
kWh
$2,023
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $935 $20 $743
10,564
kWh
$192
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $697 $675 $697
9,903
kWh
- - - -
07 2.4133: Use most efficient type of electric motors $43 $87 $33
474
kWh
$10
-
kW-mo/yr
- - -
08 2.7232: Replace existing hvac unit with high efficiency model $39,566 $55,100 n/a $33,077
470,185
kWh
$6,489
-
kW-mo/yr
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,865 $10,800 n/a $5,489
78,021
kWh
$1,376
-
kW-mo/yr
- - -
10 2.7229: Air condition only space necessary $957 $4,260 $957
19,381
kWh
- - - -
11 3.5315: Lease / purchase baler; sell cardboard to recycler $4,280 $17,100 - - $4,280
-
lb
- -
12 4.521: Clear and rent existing space $96,000 $8,340 - - - $96,000 -
TOTAL RECOMMENDED $172,038 $136,916 $58,875
842,665
kWh
$11,931
-
kW-mo/yr
$4,280
-
lb
$96,000 $952
TOTAL IMPLEMENTED $119,831 $55,785 $14,533
206,588
kWh
$4,066
-
kW-mo/yr
$4,280
-
lb
$96,000 $952
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings