ITAC Assessment: OR0432
ITAC logo
ITAC Assessment: OR0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $100
M
to 500
M
# of Employees 800
Plant Area
n/a
Annual Production 12
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $891,633 32,013,072
kWh
Electricity Demand $321,275 54,138
kW-mo/yr
Electricity Fees $525 -
Natural Gas $341,058 58,189
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,960

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 3.5144: Recycle spent tanning solution $136,000 $280,000 - - - $63,000
-
gal
$73,000
02 2.4133: Use most efficient type of electric motors $25,900 $32,000 $17,500
629,000
kWh
$8,400
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $10,830 $1,200 - - $10,830
-
MMBtu
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,230 $7,640 $4,590
164,720
kWh
$5,640
-
kW-mo/yr
- - -
05 2.3212: Optimize plant power factor $8,813 $8,813 - $8,813
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $191,773 $329,653 $22,090
793,720
kWh
$22,853
-
kW-mo/yr
$10,830
-
MMBtu
$63,000
-
gal
$73,000
TOTAL IMPLEMENTED $46,960 $40,840 $22,090
793,720
kWh
$14,040
-
kW-mo/yr
$10,830
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs