Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,047

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0294 #07 Y:2023 Use solar heat for heat $4,761 $15,950
TT0294 #06 Y:2023 Change rate schedules or other changes in utility service $4,671 $500
TT0294 #05 Y:2023 Air condition only space necessary $6,563 $18,000
TT0294 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $13,950 $3,100
TT0294 #03 Y:2023 Provide proper maintenance of motor driven equipment $14,815 $12,000
TT0294 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $15,944 $43,883
TT0294 #01 Y:2023 Begin a practice of predictive / preventative maintenance $77,940 $2,000
SF0600 #06 Y:2023 Use solar heat to make electricty $50,839 $316,988
SF0600 #05 Y:2023 Insulate bare equipment $937 $3,563
SF0600 #04 Y:2023 Use flue gases to heat process or service water $17,278 $24,708
SF0600 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $13,662 $6,270
SF0600 #02 Y:2023 Eliminate or reduce compressed air usage $738 $50
SF0600 #01 Y:2023 Change rate schedules or other changes in utility service $18,276 -
OR0770 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $206 -
OR0770 #03 Y:2023 Replace existing chiller with high efficiency model $4,249 $9,000
OR0770 #02 Y:2023 Reduce scrap production $111,700 $282,420
OR0770 #01 Y:2023 Preheat boiler makeup water with waste process heat $2,142 $6,704
KS2316 #11 Y:2023 Use solar heat to make electricty $52,146 $422,182
KS2316 #10 Y:2023 Replace existing chiller with high efficiency model $17,892 $156,412
KS2316 #09 Y:2023 Use / purchase optimum sized compressor $49,691 $246,356