ITAC Assessment: SF0600
ITAC logo
ITAC Assessment: SF0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cookies
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 42,000
ft2
Annual Production 120,000
units
Production Hrs. Annual 6,672
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,810 261,019
kWh
Electricity Demand $26,123 671
kW-mo/yr
Natural Gas $40,550 2,126
MMBtu
TOTAL YEARLY COSTS $103,483
RECOMMENDED SAVINGS* $101,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $18,276 - - - $18,276 - -
02 2.4239: Eliminate or reduce compressed air usage $738 $50 $535
3,800
kWh
$203
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,662 $6,270 $8,082
57,362
kWh
$4,425
-
kW-mo/yr
- - $1,155
04 2.2425: Use flue gases to heat process or service water $17,278 $24,708 - - - $17,278
-
MMBtu
-
05 2.2511: Insulate bare equipment $937 $3,563 - - - $937
-
MMBtu
-
06 2.9114: Use solar heat to make electricty $50,839 $316,988 $50,839
272,744
kWh
- - - -
TOTAL RECOMMENDED $101,730 $351,579 $59,456
333,906
kWh
$4,628
-
kW-mo/yr
$18,276 $18,215
-
MMBtu
$1,155
TOTAL IMPLEMENTED $51,577 $317,038 $51,374
276,544
kWh
$203
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs