ITAC Assessment: TT0294
ITAC logo
ITAC Assessment: TT0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic Pieces
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 116,700
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $322,517 5,197,120
kWh
Electricity Demand $178,449 13,885
kW-mo/yr
Electricity Fees $(-64,242.0) -
Natural Gas $65,363 4,502
MMBtu
LPG $25,502 1,406
MMBtu
Waste Disposal Costs
Water Usage $25,235 9,892
Tgal
Water Disposal $49,553 9,892
Tgal
TOTAL YEARLY COSTS $602,377
RECOMMENDED SAVINGS* $144,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $77,940 $2,000 - - - - $77,940
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,944 $43,883 $11,407
183,680
kWh
$4,537
-
kW-mo/yr
- - -
03 2.4313: Provide proper maintenance of motor driven equipment $14,815 $12,000 - - - $14,815 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,950 $3,100 $13,950
224,640
kWh
- - - -
05 2.7229: Air condition only space necessary $6,563 $18,000 - - $6,563
-
MMBtu
- -
06 2.8114: Change rate schedules or other changes in utility service $4,671 $500 - - - $4,671 -
07 2.9113: Use solar heat for heat $4,761 $15,950 $4,761
76,670
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $3,236 $7,500 $3,236
52,104
kWh
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,938 $40 $1,938
31,200
kWh
- - - -
10 2.6212: Turn off equipment during breaks, reduce operating time $974 $500 $974
15,677
kWh
- - - -
11 2.7224: Reduce space conditioning during non-working hours $88 $100 $88
1,414
kWh
- - - -
TOTAL RECOMMENDED $144,880 $103,573 $36,354
585,385
kWh
$4,537
-
kW-mo/yr
$6,563
-
MMBtu
$19,486 $77,940
TOTAL IMPLEMENTED $131,618 $69,583 $29,655
477,515
kWh
$4,537
-
kW-mo/yr
- $19,486 $77,940
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs