| Assessment Year | 2021 |
|---|---|
| Principal Product | medical & hemostasis devices |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 175 |
| Plant Area |
80,000
ft2
|
| Annual Production | 1,300,000
units
|
| Production Hrs. Annual | 6,370
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $277,111 | 2,327,386 |
kWh
|
$0.12 |
| Electricity Demand | $92,643 | 3,795 |
kW-mo/yr
|
$24.41 |
| Electricity Fees | $118,764 | - |
|
- |
| Natural Gas | $28,627 | 2,065 |
MMBtu
|
$13.86 |
| TOTAL YEARLY COSTS | $517,145 | |||
| RECOMMENDED SAVINGS* | $46,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $37,558 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $770 | - |
$770
4,354
kWh
|
- | - | - | |
| 02 | 2.7229: Air condition only space necessary | $35,739 | $5,236 |
$21,328
120,633
kWh
|
- | - |
$14,411
-
MMBtu
|
|
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $6,884 | $1,122 |
$6,884
38,938
kWh
|
- | - | - | |
| 04 | 2.7144: Install spectral reflectors / delamp | $603 | $135 |
$502
2,838
kWh
|
$101
-
kW-mo/yr
|
- | - | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $294 | $90 |
$294
1,661
kWh
|
- | - | - | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $1,819 | $622 | - |
$1,190
-
kW-mo/yr
|
$629 | - | |
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $445 | $3,212 |
$198
1,122
kWh
|
$247
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $46,554 | $10,417 |
$29,976
169,546
kWh
|
$1,538
-
kW-mo/yr
|
$629 |
$14,411
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $37,558 | $5,858 |
$21,328
120,633
kWh
|
$1,190
-
kW-mo/yr
|
$629 |
$14,411
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs