ITAC Assessment: NC0078
ITAC logo
ITAC Assessment: NC0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Magnet Wire
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 179,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,946 20,041,618
kWh
Electricity Demand $515,305 31,087
kW-mo/yr
Electricity Fees $23,870 -
Natural Gas $112,200 29,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,648 $6,993 $1,361
53,048
kWh
$1,287
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,528 $1,530 $333
12,896
kWh
$284
-
kW-mo/yr
- $911
03 2.2612: Use cooling tower water instead of refrigeration $14,370 $7,500 $14,370
560,082
kWh
- - -
04 2.2628: Utilize a less expensive cooling method $5,344 - $1,499
58,324
kWh
$3,845
-
kW-mo/yr
- -
05 2.4312: Improve lubrication practices $9,017 $20,000 $3,833
162,075
kWh
$5,184
-
kW-mo/yr
- -
06 3.3125: Use distillation, evaporation to remove contaminants $7,134 $25,000 - - $7,134
-
lb
-
TOTAL RECOMMENDED $40,041 $61,023 $21,396
846,425
kWh
$10,600
-
kW-mo/yr
$7,134
-
lb
$911
TOTAL IMPLEMENTED $31,379 $34,493 $21,063
833,529
kWh
$10,316
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs