Assessment Year | 1996 |
---|---|
Principal Product | Magnet Wire |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
179,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $508,946 | 20,041,618 |
kWh
|
$0.025 |
Electricity Demand | $515,305 | 31,087 |
kW-mo/yr
|
$16.58 |
Electricity Fees | $23,870 | - |
|
- |
Natural Gas | $112,200 | 29,243 |
MMBtu
|
$3.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,379 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,648 | $6,993 |
$1,361
53,048
kWh
|
$1,287
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,528 | $1,530 |
$333
12,896
kWh
|
$284
-
kW-mo/yr
|
- | $911 | |
03 | 2.2612: Use cooling tower water instead of refrigeration | $14,370 | $7,500 |
$14,370
560,082
kWh
|
- | - | - | |
04 | 2.2628: Utilize a less expensive cooling method | $5,344 | - |
$1,499
58,324
kWh
|
$3,845
-
kW-mo/yr
|
- | - | |
05 | 2.4312: Improve lubrication practices | $9,017 | $20,000 |
$3,833
162,075
kWh
|
$5,184
-
kW-mo/yr
|
- | - | |
06 | 3.3125: Use distillation, evaporation to remove contaminants | $7,134 | $25,000 | - | - |
$7,134
-
lb
|
- | |
TOTAL RECOMMENDED | $40,041 | $61,023 |
$21,396
846,425
kWh
|
$10,600
-
kW-mo/yr
|
$7,134
-
lb
|
$911 | ||
TOTAL IMPLEMENTED | $31,379 | $34,493 |
$21,063
833,529
kWh
|
$10,316
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs