ITAC Assessment: OR0770
ITAC logo
ITAC Assessment: OR0770
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 80,000
bbl
Production Hrs. Annual 4,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,251 2,189,800
kWh
Electricity Demand $68,259 6,175
kW-mo/yr
Electricity Fees $9,346 -
Natural Gas $155,738 16,068
MMBtu
Waste Disposal Costs
Water Usage $46,281 15,297
Tgal
TOTAL YEARLY COSTS $392,875
RECOMMENDED SAVINGS* $118,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.2441: Preheat boiler makeup water with waste process heat $2,142 $6,704 - - $2,142
-
MMBtu
-
02 3.1192: Reduce scrap production $111,700 $282,420 - - - $111,700
03 2.2622: Replace existing chiller with high efficiency model $4,249 $9,000 $4,249
88,303
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $206 - $96
1,989
kWh
$110
-
kW-mo/yr
- -
TOTAL RECOMMENDED $118,297 $298,124 $4,345
90,292
kWh
$110
-
kW-mo/yr
$2,142
-
MMBtu
$111,700
TOTAL IMPLEMENTED $6,391 $15,704 $4,249
88,303
kWh
- $2,142
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs