Assessment Year | 2023 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
75,000
ft2
|
Annual Production | 80,000
bbl
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $113,251 | 2,189,800 |
kWh
|
$0.052 | |
Electricity Demand | $68,259 | 6,175 |
kW-mo/yr
|
$11.05 | |
Electricity Fees | $9,346 | - |
|
- | |
Natural Gas | $155,738 | 16,068 |
MMBtu
|
$9.69 | |
Waste Disposal Costs | |||||
Water Usage | $46,281 | 15,297 |
Tgal
|
$3.03 | |
TOTAL YEARLY COSTS | $392,875 | ||||
RECOMMENDED SAVINGS* | $118,297 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,391 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $2,142 | $6,704 | - | - |
$2,142
-
MMBtu
|
- | |
02 | 3.1192: Reduce scrap production | $111,700 | $282,420 | - | - | - | $111,700 | |
03 | 2.2622: Replace existing chiller with high efficiency model | $4,249 | $9,000 |
$4,249
88,303
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $206 | - |
$96
1,989
kWh
|
$110
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $118,297 | $298,124 |
$4,345
90,292
kWh
|
$110
-
kW-mo/yr
|
$2,142
-
MMBtu
|
$111,700 | ||
TOTAL IMPLEMENTED | $6,391 | $15,704 |
$4,249
88,303
kWh
|
- |
$2,142
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs