Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,190

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0327 #06 Y:2002 Turn off equipment when not in use $9,397 $2,000
AS0327 #05 Y:2002 Replace existing hvac unit with high efficiency model $863 $2,450
AS0327 #04 Y:2002 Reduce the pressure of compressed air to the minimum required $4,661 $60
AS0327 #03 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,352 $3,671
AS0327 #02 Y:2002 Utilize higher efficiency lamps and/or ballasts $7,154 $10,992
AS0327 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $28,614 $200
NC0239 #05 Y:2002 Increase amount of waste recovered for resale $11,025 $6,500
NC0239 #04 Y:2002 Replace electrically-operated equipment with fossil fuel equipment $10,119 $15,000
NC0239 #03 Y:2002 Eliminate or reduce compressed air usage $132 $60
NC0239 #02 Y:2002 Develop a repair/replace policy $614 $3,190
NC0239 #01 Y:2002 Analyze flue gas for proper air/fuel ratio $5,731 $15,000
MI0040 #05 Y:2002 Install soft-start to eliminate nuisance trips $50,534 $52,260
MI0040 #04 Y:2002 Add equipment/ operators to reduce production bottleneck $2,252 $30
MI0040 #03 Y:2002 Change procedures / equipment / operating conditions $25,467 $18,252
MI0040 #02 Y:2002 Begin a practice of predictive / preventative maintenance $86,400 $6,084
MI0040 #01 Y:2002 Install back-up equipment $16,380 $17,500
LL0141 #06 Y:2002 Use photocell controls $2,062 $51
LL0141 #05 Y:2002 Reduce illumination to minimum necessary levels $3,273 -
LL0141 #04 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $9,695 $1,485
LL0141 #03 Y:2002 Optimize plant power factor $15,140 $23,730