Assessment Year | 2002 |
---|---|
Principal Product | Metal plating, electroplating, anodizing |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
66,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,048
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $243,229 | 4,016,960 |
kWh
|
$0.061 |
Electricity Demand | $15,848 | 9,590 |
kW-mo/yr
|
$1.65 |
Electricity Fees | $18,888 | - |
|
- |
Natural Gas | $95,020 | 10,845 |
MMBtu
|
$8.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $117,870 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,030 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $28,614 | $200 |
$23,156
502,304
kWh
|
$5,458
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,154 | $10,992 |
$5,031
109,141
kWh
|
$2,123
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,352 | $3,671 |
$896
19,447
kWh
|
$456
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,661 | $60 |
$3,759
81,534
kWh
|
$902
-
kW-mo/yr
|
- | - | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $863 | $2,450 |
$512
11,115
kWh
|
$351
-
kW-mo/yr
|
- | - | |
06 | 2.6218: Turn off equipment when not in use | $9,397 | $2,000 |
$9,397
203,840
kWh
|
- | - | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,255 | $60 | - | - |
$1,255
-
lb
|
- | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $12,220 | $20,500 | - | - |
$12,220
-
lb
|
- | |
09 | 4.521: Clear and rent existing space | $50,550 | $7,748 | - | - | - | $50,550 | |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,804 | $108 | - | - | - | $1,804 | |
TOTAL RECOMMENDED | $117,870 | $47,789 |
$42,751
927,381
kWh
|
$9,290
-
kW-mo/yr
|
$13,475
-
lb
|
$52,354 | ||
TOTAL IMPLEMENTED | $42,030 | $8,429 |
$33,961
736,706
kWh
|
$6,265
-
kW-mo/yr
|
- | $1,804 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs