ITAC Assessment: AS0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Metal plating, electroplating, anodizing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 66,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,048
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,229 4,016,960
kWh
Electricity Demand $15,848 9,590
kW-mo/yr
Electricity Fees $18,888 -
Natural Gas $95,020 10,845
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,614 $200 $23,156
502,304
kWh
$5,458
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,154 $10,992 $5,031
109,141
kWh
$2,123
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,352 $3,671 $896
19,447
kWh
$456
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,661 $60 $3,759
81,534
kWh
$902
-
kW-mo/yr
- -
05 2.7232: Replace existing hvac unit with high efficiency model $863 $2,450 $512
11,115
kWh
$351
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $9,397 $2,000 $9,397
203,840
kWh
- - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $1,255 $60 - - $1,255
-
lb
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,220 $20,500 - - $12,220
-
lb
-
09 4.521: Clear and rent existing space $50,550 $7,748 - - - $50,550
10 4.111: Add equipment/ operators to reduce production bottleneck $1,804 $108 - - - $1,804
TOTAL RECOMMENDED $117,870 $47,789 $42,751
927,381
kWh
$9,290
-
kW-mo/yr
$13,475
-
lb
$52,354
TOTAL IMPLEMENTED $42,030 $8,429 $33,961
736,706
kWh
$6,265
-
kW-mo/yr
- $1,804
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs