Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 2,500,000
ft2
Annual Production 145,393,976
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $917,724 21,752,500
kWh
Electricity Demand $363,684 49,298
kW-mo/yr
Electricity Fees $51,185 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $235,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $214,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3137: Use power during off-peak periods $189,217 - - $181,939
-
kW-mo/yr
$7,278
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,007 $2,985 $15,391
364,283
kWh
- $616
03 2.3212: Optimize plant power factor $15,140 $23,730 - $14,558
-
kW-mo/yr
$582
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,695 $1,485 $9,322
220,663
kWh
- $373
05 2.7111: Reduce illumination to minimum necessary levels $3,273 - $2,507
59,345
kWh
$640
-
kW-mo/yr
$126
06 2.7134: Use photocell controls $2,062 $51 $1,770
41,891
kWh
$213
-
kW-mo/yr
$79
TOTAL RECOMMENDED $235,394 $28,251 $28,990
686,182
kWh
$197,350
-
kW-mo/yr
$9,054
TOTAL IMPLEMENTED $214,919 $4,470 $24,713
584,946
kWh
$181,939
-
kW-mo/yr
$8,267
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs