4,204
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0855 #02 Y:2012 | 02 | 2012 | Meter recycled water (to reduce sewer charges) | $7,300 | $30,000 | |
| UD0855 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $23,100 | - | |
| SF0415 #09 Y:2012 | 09 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $95,167 | - | |
| SF0415 #08 Y:2012 | 08 | 2012 | Use or replace with energy efficient substitutes | $21,277 | $149,347 | |
| SF0415 #07 Y:2012 | 07 | 2012 | Use or replace with energy efficient substitutes | $12,835 | $60,972 | |
| SF0415 #06 Y:2012 | 06 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $6,582 | $28,175 | |
| SF0415 #05 Y:2012 | 05 | 2012 | Install occupancy sensors | $3,106 | $10,756 | |
| SF0415 #04 Y:2012 | 04 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $5,606 | $11,795 | |
| SF0415 #03 Y:2012 | 03 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $136,139 | $189,204 | |
| SF0415 #02 Y:2012 | 02 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $18,634 | $8,163 | |
| SF0415 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $77,652 | $5,000 | |
| UM0401 #04 Y:2012 | 04 | 2012 | Use flow control valves on equipment to optimize water use | $1,066 | $448 | |
| UM0401 #03 Y:2012 | 03 | 2012 | Use cooling tower or economizer to replace chiller cooling | $34,019 | $5,000 | |
| UM0401 #02 Y:2012 | 02 | 2012 | Install occupancy sensors | $5,655 | $21,250 | |
| UM0401 #01 Y:2012 | 01 | 2012 | Install compressor air intakes in coolest locations | $1,538 | $1,500 | |
| OR0583 #06 Y:2012 | 06 | 2012 | Re-size charging openings or add movable cover or door | $2,779 | $6,600 | |
| OR0583 #05 Y:2012 | 05 | 2012 | Install / repair insulation on steam lines | $1,391 | $3,854 | |
| OR0583 #04 Y:2012 | 04 | 2012 | Establish burner maintenance schedule for boilers | $6,078 | $500 | |
| OR0583 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $6,663 | $19,592 | |
| OR0583 #02 Y:2012 | 02 | 2012 | Re-size charging openings or add movable cover or door | $2,994 | $10,000 |