ITAC Assessment: UM0401
ITAC logo
ITAC Assessment: UM0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product structural foam plastic products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 358,614
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $675,617 10,743,543
kWh
Natural Gas $40,076 6,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $1,538 $1,500 $1,538
24,409
kWh
02 2.7135: Install occupancy sensors $5,655 $21,250 $5,655
89,760
kWh
03 2.2614: Use cooling tower or economizer to replace chiller cooling $34,019 $5,000 $34,019
540,000
kWh
04 3.4156: Use flow control valves on equipment to optimize water use $1,066 $448 $1,066
16,920
kWh
TOTAL RECOMMENDED $42,278 $28,198 $42,278
671,089
kWh
TOTAL IMPLEMENTED $35,085 $5,448 $35,085
556,920
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs