ITAC Assessment: WI0130
ITAC logo
ITAC Assessment: WI0130
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 1,600,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $500,369 7,327,374
kWh
Natural Gas $228,070 88,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $33,213 $20,000 $5,093
74,736
kWh
- $28,120
02 2.7221: Lower temperature during the winter season and vice-versa $5,028 - $5,028
73,564
kWh
- -
03 2.4312: Improve lubrication practices $4,776 - $4,776
70,047
kWh
- -
04 2.2437: Recover waste heat from equipment $1,068 $3,100 - $1,068
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $1,149 $1,920 $1,149
16,706
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $565 $700 $673
9,965
kWh
$(-108.0)
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $340 - $340
4,982
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $21 $17 $21
293
kWh
- -
TOTAL RECOMMENDED $46,160 $25,737 $17,080
250,293
kWh
$960
-
MMBtu
$28,120
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs