Assessment Year | 2012 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 80 |
Plant Area |
1,700,000
ft2
|
Annual Production | 12,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $965,684 | 13,059,828 |
kWh
|
$0.074 |
Electricity Demand | $536,086 | 27,952 |
kW-mo/yr
|
$19.18 |
Electricity Fees | $64,950 | - |
|
- |
Natural Gas | $189,772 | 30,727 |
MMBtu
|
$6.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $376,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $293,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $77,652 | $5,000 |
$56,271
762,482
kWh
|
$21,381
-
kW-mo/yr
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,634 | $8,163 |
$13,498
182,896
kWh
|
$5,136
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $136,139 | $189,204 |
$102,961
1,383,282
kWh
|
$33,178
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,606 | $11,795 |
$5,606
75,958
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $3,106 | $10,756 |
$2,163
29,278
kWh
|
$943
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,582 | $28,175 |
$4,985
67,002
kWh
|
$1,597
-
kW-mo/yr
|
- | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $12,835 | $60,972 |
$8,319
111,995
kWh
|
$4,516
-
kW-mo/yr
|
- | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $21,277 | $149,347 | - | - | - |
$21,277
-
MMBtu
|
|
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $95,167 | - | - | - | $95,167 | - | |
TOTAL RECOMMENDED | $376,998 | $463,412 |
$193,803
2,612,893
kWh
|
$66,751
-
kW-mo/yr
|
$95,167 |
$21,277
-
MMBtu
|
||
TOTAL IMPLEMENTED | $293,740 | $446,617 |
$131,926
1,774,453
kWh
|
$45,370
-
kW-mo/yr
|
$95,167 |
$21,277
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs