ITAC Assessment: SF0415
ITAC logo
ITAC Assessment: SF0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 80
Plant Area 1,700,000
ft2
Annual Production 12,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $965,684 13,059,828
kWh
Electricity Demand $536,086 27,952
kW-mo/yr
Electricity Fees $64,950 -
Natural Gas $189,772 30,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $376,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $293,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $77,652 $5,000 $56,271
762,482
kWh
$21,381
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $18,634 $8,163 $13,498
182,896
kWh
$5,136
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $136,139 $189,204 $102,961
1,383,282
kWh
$33,178
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,606 $11,795 $5,606
75,958
kWh
- - -
05 2.7135: Install occupancy sensors $3,106 $10,756 $2,163
29,278
kWh
$943
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,582 $28,175 $4,985
67,002
kWh
$1,597
-
kW-mo/yr
- -
07 2.4322: Use or replace with energy efficient substitutes $12,835 $60,972 $8,319
111,995
kWh
$4,516
-
kW-mo/yr
- -
08 2.4322: Use or replace with energy efficient substitutes $21,277 $149,347 - - - $21,277
-
MMBtu
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $95,167 - - - $95,167 -
TOTAL RECOMMENDED $376,998 $463,412 $193,803
2,612,893
kWh
$66,751
-
kW-mo/yr
$95,167 $21,277
-
MMBtu
TOTAL IMPLEMENTED $293,740 $446,617 $131,926
1,774,453
kWh
$45,370
-
kW-mo/yr
$95,167 $21,277
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs