ITAC Assessment: OR0583
ITAC logo
ITAC Assessment: OR0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Dairy Processing
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 30,169
ft2
Annual Production 9,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,900 1,844,400
kWh
Electricity Demand $26,289 3,980
kW-mo/yr
Natural Gas $8,043 1,210
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,051

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2626: Avoid frost formation on evaporators $3,140 $2,412 $2,190
37,927
kWh
$950
-
kW-mo/yr
- - -
02 2.2531: Re-size charging openings or add movable cover or door $2,994 $10,000 $2,994
51,846
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,663 $19,592 $4,180
72,375
kWh
$306
-
kW-mo/yr
- $561 $1,616
04 2.1231: Establish burner maintenance schedule for boilers $6,078 $500 - - $6,578
-
MMBtu
$(-500.0) -
05 2.2136: Install / repair insulation on steam lines $1,391 $3,854 $1,391
57,604
kWh
- - - -
06 2.2531: Re-size charging openings or add movable cover or door $2,779 $6,600 $2,779
48,116
kWh
- - - -
TOTAL RECOMMENDED $23,045 $42,958 $13,534
267,868
kWh
$1,256
-
kW-mo/yr
$6,578
-
MMBtu
$61 $1,616
TOTAL IMPLEMENTED $20,051 $32,958 $10,540
216,022
kWh
$1,256
-
kW-mo/yr
$6,578
-
MMBtu
$61 $1,616
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs